Exensio
english - german doesnt work, images dont show so he put it to english and then it did work.
- irving needs to upgrade to latest verion
/ done 24/10
- not use default user / same UI everyone. Customized user / default user overrites it.
- check path pharma products 300 - N2 - 30ST - double paths,
- Sort by name doenst work
Multipe naming
Create structure called documents with 1 row with each and link it under general. Mandatory texts that points to entity. So they can use multiple names for the same products.
- Change logo to make it look better
- Help snapshot data and copy it over
- Next meeting / getting ready for demo.
Exensio: 27-3
we have been refining the 11 version
speed for downloading
publishing features with embedded
Collections (exensio uses them) migratable to new version
-> update demo environnement
-> take up speed after push the latest version
-> review / right timing -> 2/3 weeks , mid april.
Share pitchdeck / brochure -> so he can persuade client to upgrade sooner.
Hi Dieneke,
thanks, all is well.
In the meantime, I took some time to set up a new demo version of em11 for the scenario of our pharma customer. If you like, I can give a short demo.
Unfortunately, our customer again postponed the migration to em10 – this is now planned for August. After that, I want to start to talk to them on em11.
Best,
Irving
I know you are heavily working on em11 – but maybe you have time for some hints for us on our customer’s migration em9 to em10. This is now scheduled for Aug. 7.
In preparation of the migration, we still identified some mapping conflicts – and tried some actions to get rid of them, with minor success.
Although we think that everything is working correctly, we anyhow would like to understand the issues and a way to correct the mapping.
Also, there is a small bug displaying the keywords attribute within the advanced filter (works on Dev environment but not on Production). May be here you can help pointing us in the right direction where to search for a solution (we did already a wide-range file compare on this between Dev and Prod, checked permissions etc. - but couldn’t solve the issue).
I would be very happy, if you could spare some time for us next week to go through those 2 points. Would this be possible? Irving (email)
Meeting Summary - Exensio eMedia Upgrade
Purpose: Discussion about upgrading the customer’s eMedia system from version 10 to version 11.
Key Points:
Upgrade to Version 11:
Customer has previously migrated from version 9 to 10, a process that took longer than desired.
Version 11 offers enhanced features and performance.
EnterMediaDB is prepared to expedite the upgrade.
Migration Plan & Timeline:
Proposed timeline of 1-2 weeks with a dedicated team to accelerate the process.
Plan includes 10 meetings over 2 or 3 weeks, depending on the customer’s readiness and availability.
Technical Considerations:
Large data volume requires direct collaboration with the customer’s IT team.
Use of a Docker-based approach to streamline migration and setup in the new environment.
A detailed migration plan and proposal will be developed for the customer.
Pricing and Support:
Fixed fee model of $250 per meeting, totaling 10 meetings.
Next Steps:
Reconnect with the customer by the end of November (after their vacation) to confirm interest and availability.
EnterMediaDB to provide a migration plan and proposal for customer review prior to the follow-up.
Action Points:
Confirm customer’s interest and availability post-vacation.
Prepare and send a migration plan and proposal for the customer’s review.
Schedule the 10-meeting engagement.
Coordinate with the customer’s IT team on technical setup and data volume management.
Confirm customer’s interest and availability post-vacation.
Prepare and send a migration plan and proposal for the customer’s review.
Schedule the 10-meeting engagement.
Coordinate with the customer’s IT team on technical setup and data volume management.